Mobile
Log In Sign Up
Home > english-chinese > "test failure" in Chinese

Chinese translation for "test failure"

测试不合格
电测不良
试验失败
试验失效
试验时的损坏


Related Translations:
disk failure:  磁盘故障
deterioration failure:  变质失效老化形成的故障劣化失效磨损故障损坏失败退化失效逐渐恶化的故障
fatigue failure:  疲劳断裂疲劳破裂疲劳破损疲劳失效疲劳损毁;疲劳破坏
linearity failure:  线性故障
safe failure:  安全故障
about failure:  失败的
failure state:  失效状态
plane failure:  平面破坏
protocol failure:  记录无效
general failure:  一般故障一般性破坏
Example Sentences:
1.Troubleshooting and root cause analysis for test failure unit
分析和维修测试不良品
2.Test failure is reported as a single line status
测试失败作为单行状态报告;报告符合
3.Do procedures exist that define what to do in the event of test failures
是否有程序来界定当测试不通过时要做什么?
4.Do procedures exist that define what to do in the event of test failures
对与测试坏品,有无存在一个定义了应该怎么做的流程?
5.Do procedures exist that define what to do in the event of test failures
是否存在对测试不良结果如何处理有作定义/规定的程序/规程? ?
6.The main challenge for us was to make anthill report the test failures and still publish the test results
我们的主要挑战是让anthill报告失败的测试并且仍然发布测试结果。
7.This paper models the failed test by using the finite element method and the results explained the reason of the test failure
本论文通过有限单元法对试验过程进行了模拟,计算结果解释了试验现象。
8.Leaving continue after failure unchecked means that the ordered test will stop running after the first occurrence of a test failure
不选中“失败后继续”表示在首次发生测试失败后,顺序测试将停止运行。
9.As soon as jester detects a single test failure , it aborts the run , so failing as early as possible can short - circuit a lot of time - consuming extra tests
只要jester发现一个测试失败,就会终止运行,所以尽早失败可以短路大量耗时的额外测试。
10.At the same time , the corresponding programs on the above two methods can be compiled in frotran90 respectively , which are used to analyze the influence of several factors on behaviour of barrette pile group and barrette pile group - soil - cap interaction , including collocation of pile , ratio of length to width , pile spacing , ratio of depth to equivalent diameter , ratio of modulus of pile to soil , possion ' s ratio , the finite layer , the number of piles etc . lastly a series of model tests on vertically - loaded bahaviour of single pile are made , tests results are analyzed , and the causes of tests failure are preliminarily discussed in this paper
分析了群桩布置形式、长宽比、桩与桩之间的相对距离,桩径比、桩土刚度比、泊松比、有限压缩层深度以及群桩根数等因素对壁板桩群桩和壁板桩群桩?土?承台的相互共同作用问题的影响。论文最后做了一组壁板桩和圆形桩单桩模型试验,对试验数据进行了分析,并对试验中存在的问题进行了初步探讨。
Similar Words:
"test exposure" Chinese translation, "test face" Chinese translation, "test facilities" Chinese translation, "test facilities and instruments" Chinese translation, "test facility" Chinese translation, "test failure load" Chinese translation, "test family and friends" Chinese translation, "test fan" Chinese translation, "test farm" Chinese translation, "test fence exposure" Chinese translation